Wednesday, September 29, 2010

Welded Wire Fence For Garden

window and door installation

The last day, much has happened. Yesterday afternoon (with elec. Shutters) our windows and supplied the front door. Since the access is to our home in a road game (actually dead) and the truck driver may not be the Behelfszufahrt at the end of the impasse, which was released for the period of construction as a thoroughfare, knew. Did he stand on which all the windows and front door transport were fitted by forklift truck driven separately from the main road to our house and then placed in the gravel driveway.

The next morning, the window fitters started the windows to distribute it to their new places. It was found that our kitchen overhead light was given by the shell too small. So had one of the technicians about 2-3 cm below mortar reasonably lay cables from the steel lintel, so that the opening is large enough for our kitchen overhead light (about 180 cm x 60 cm).

After the door was fitted with glass side panel, we have received our Building key. Building key is the only for the construction phase and is intended for all craftsmen, because all have a key so they can at any time in the house. Then decrease to house a new cylinder is installed and only then we get the keys to the locking system.

The mechanics worked quickly and neatly. After only two days all the windows and front door were there.

kitchen skylight installer braces off mortar







































window Power points for Blinds