After the ground floor had been erected very quickly, now, the ceiling cast to the upper floor. The ceiling part was delivered and the masons have the ceilings with steel parts (Reinforcement) as static and adds everything together. Also openings for the proposed ventilation system, and drains (floor level shower) have been incorporated.
















































Above: As a thank you we leave the car a nice pile of concrete pumps and cleans his truck on site. This gives us 210.00 EUR per truck (2 pcs.) Saved.