New house Weber, Gerlafingen

Who Old Are You Of Monica Roccaforte

Deitingenstrasse EFH, Luterbach

on our site in Luterbach was launched this week with the plastering. A short but better picture of this work to You will see displayed on the video.

Wednesday, September 29, 2010

Welded Wire Fence For Garden

window and door installation

The last day, much has happened. Yesterday afternoon (with elec. Shutters) our windows and supplied the front door. Since the access is to our home in a road game (actually dead) and the truck driver may not be the Behelfszufahrt at the end of the impasse, which was released for the period of construction as a thoroughfare, knew. Did he stand on which all the windows and front door transport were fitted by forklift truck driven separately from the main road to our house and then placed in the gravel driveway.

The next morning, the window fitters started the windows to distribute it to their new places. It was found that our kitchen overhead light was given by the shell too small. So had one of the technicians about 2-3 cm below mortar reasonably lay cables from the steel lintel, so that the opening is large enough for our kitchen overhead light (about 180 cm x 60 cm).

After the door was fitted with glass side panel, we have received our Building key. Building key is the only for the construction phase and is intended for all craftsmen, because all have a key so they can at any time in the house. Then decrease to house a new cylinder is installed and only then we get the keys to the locking system.

The mechanics worked quickly and neatly. After only two days all the windows and front door were there.

kitchen skylight installer braces off mortar







































window Power points for Blinds

Tuesday, September 28, 2010

Red White Cable To Headphone Jack To Tv

EFH Neumann, Gerlafingen

soon as we have started the new project, it protrudes from the very bottom. The ground floor ceiling is concrete.

Thursday, September 23, 2010

Connecting To Bmi At Heathrow

The roof is sealed!

Today the roofers came after it had delivered yesterday afternoon, the building material suppliers, the brick and roof windows.

jerk jerking the roof was covered ... In Spahn train, counter, tile (Braas, Harzer Big pan, granite) and then the gutters.
















HDR image

Monday, September 20, 2010

Goodie Bag For Bachelorette Party

The roof

On Monday it was finally over. The roof was supplied and the rooms have been razed to the superstructure.

In our house a rafter roof is installed. The wooden roof rafter or called collar beam roof is made of several pieces made in a row in first direction staggered pairs rafters. These pairs of rafters together with a structure at the base of the rafters a triangular frame. The distance of each frame can be 70-90 cm lie.

The wooden rafters and collar beam roof rafters are on two interconnected ridge point, for example by a shear pin, a rabbet, or by both sides mounted plates. To facilitate the assembly of the rafters in the roof is often a straight edge fitted such as straightedge. This connects the rafter pairs in the longitudinal direction. For the actual longitudinal bracing of the roof but wooden Windrispen, Windrispenbänder of metal, or by bracing formwork is required.

was the horizontal connection on the rafter shoe in traditional structures made of wooden beams. We used the basement ceiling reinforced concrete as the lower part of the triangular frame.

The collar beam roof is a special form of the roof rafters, which was built here, too. Because it allows larger spans, or building depths are achieved than is possible with the simple rafter roof. The individual rafter pairs are each connected by a horizontal collar beams. This design can reduce the bending of the rafters under load.















A role played by the collar beam roof in the attic also. Here is the entirety of the collar beam, the collar beam position as the upper end of the attic. Whose height determines the extent the height of the collar beams, often in the upper half of the roof structure.
















































































On the same evening there was a small drink. Sorry I could not carpenters to stay and to convince announced an indicative sentence. Sure, the work is done, wanted to start my journey home.

Tuesday, September 14, 2010

Sportswagen Or A3 Tdi

indicative date is known

Today we have received from our supervisor Mr. D. the statement that the roof will be delivered on Monday 09/20/2010.

Whether we are less than two weeks to seek a halt again? Our construction manager is very concerned and has the masons have preferred for the upper floor. Actually, should come only after the roof to gable walls, eaves and interior walls.

Friday, September 3, 2010

My Apologies For The Inconvenience Caused.

Baustillstand!

Today we learn that the roof is not as planned next week will be opened. The carpentry is not with the existing workload and therefore can not deliver our roof.

Now it is wait ... and I can not wait so bad!

Thursday, September 2, 2010

Custom Lamp Shade Las Vegas



After the ground floor had been erected very quickly, now, the ceiling cast to the upper floor. The ceiling part was delivered and the masons have the ceilings with steel parts (Reinforcement) as static and adds everything together. Also openings for the proposed ventilation system, and drains (floor level shower) have been incorporated.
















































Above: As a thank you we leave the car a nice pile of concrete pumps and cleans his truck on site. This gives us 210.00 EUR per truck (2 pcs.) Saved.

Wednesday, September 1, 2010

Famous Imagenes Hentay

EFH Neumann, Gerlafingen

Welcome Krokusweg

mid August, we were allowed to start our newest project, EFH Neumann, on Krokusweg. We are looking forward to her cooperation.

With one click you can view the house in 3D on all sides