Monday, October 18, 2010

White Discharge In Place Of Period, Not Pregnant

Addendum: Roof

Shortly after the topping was, I noticed that the rain pipe that was scheduled at the entrance to the left side, was suddenly placed on the RIGHT side. I was at the ceremony in the dark did not notice. Hmm, it was originally planned on the right. But since we had set the Regenwasserzysterne into the driveway and not, as the project planner (Heinz von Heiden) in the garden, was the house left corner of the shortest path. So Harry had changed from heathen to the start of construction plans and amended the drainpipe to the left corner of the house.
The amended drawings had the roofers not be met. After we confronted our construction manager and so he had viewed the site, We have now been confirmed in writing that the roofers install the drainpipe on the left side of the house is in order. The additional costs for min. 10 m rain line we had not taken over.

Thanks to Heinz von Heiden and our construction manager Mr. D.!


























When building from the roof has been probably one of the roofing of the two ventilation pipes. So it is now broken. This is not so bad, but just annoying. But here we Heinz has promised to Gentiles that the damage is repaired as quickly as possible.

0 comments:

Post a Comment