The support from the ground floor had noticed the masons, the bay, which will be glazed later, was too short. It had about 30 cm of the bottom plate was missing.
here, though the surveyor had forgotten the base plate when measuring something. The masons immediately have the missing piece bottom plate cased and suspended with steel and concrete (was provided) cast.

Here again, many thanks to the Mason team that we can only praise: Always helpful, very friendly and very well at work! Super!

Monday, October 18, 2010

Tory Burch Handbag In Malaysia

Weber, Neumann Gerlafingen

growth on Krokusweg!
Partly cloudy and gloomy it was only in the sky. At the symbolic groundbreaking ceremony for the new home of the Weber family dominated the minds of the sun. With a Cüppli and a few pretzel sticks met with the builder, architect, Hugo Schumacher, and the architect firm Bernasconi, at the start of the construction phase and the future new home.







White Discharge In Place Of Period, Not Pregnant

Addendum: Roof

Shortly after the topping was, I noticed that the rain pipe that was scheduled at the entrance to the left side, was suddenly placed on the RIGHT side. I was at the ceremony in the dark did not notice. Hmm, it was originally planned on the right. But since we had set the Regenwasserzysterne into the driveway and not, as the project planner (Heinz von Heiden) in the garden, was the house left corner of the shortest path. So Harry had changed from heathen to the start of construction plans and amended the drainpipe to the left corner of the house.
The amended drawings had the roofers not be met. After we confronted our construction manager and so he had viewed the site, We have now been confirmed in writing that the roofers install the drainpipe on the left side of the house is in order. The additional costs for min. 10 m rain line we had not taken over.

Thanks to Heinz von Heiden and our construction manager Mr. D.!


























When building from the roof has been probably one of the roofing of the two ventilation pipes. So it is now broken. This is not so bad, but just annoying. But here we Heinz has promised to Gentiles that the damage is repaired as quickly as possible.

Friday, October 15, 2010

Safenet Usb Superpro Ultrapro Network

drywall

came today, the dry farmer and the first floor external walls and pitched roofs clad with plasterboard. Nachgearbeiteet be the butt joints and screw holes so that the areas are "papered". But Auchter absolutely sure that paper before are still primed. So that the wallpaper is not forever and forever bonded to the substrate. You can get from any renovation work, the wallpaper down elsewhere again.















Thursday, October 14, 2010

Highest Rated Mascara

electrical work

Last night we met with the electrical electrician in the house to the position of sockets, light switches, switch. Shutters and thermostat to discuss the floor. We have passed each room and have the items fixed. Well, that much we actually Thoughts had made it.

(in the Comfort facilities, as of 2009 really many outlets scheduled) Additionally, we have used about 8 sockets as we had taken into account in almost every window, an outlet for Christmas lights. 5 wall lights still come about in the stairwell on every wall, patio and driveway. The additional costs were calculated by the installer on the evening of the visit. As we leave the satellite system (including rafter supports, etc.) make the electrician, in addition 1000, - € been added (of which 550, - € for the satellite system). Wall lights cost 15, - €, socket 20, - €, light switch 30, - € (subject to change.)

Since we want in our living room flat screen TV hanging on the wall, but it should be shown no cable. We had satellite box (digital down to the entrance to the digital receiver and starting again, above the entrance of the receiver to the TV), mounted socket and an additional cable channel (see picture). Even on their own performance, we have the ground floor outlets distributed to the loudspeakers, as well as network cable from work to home economics room, here is the power supply be installed. The one electrical connection to the tank to the garage and we have laid. Since I pump the tank does not want to have in the house (due to the noise a Domestic water supply does) I'm looking for an inexpensive submersible pump with automatic shutoff and 5-6 bar capacity. Who here has a hint? - Please contact us.

living room wall - Multimedia installation for TV, digital box, DVD and sound system

installing electrical light switch Hallway, switches. Rolllöden, telephone jack and power outlet
bedroom wall

Tuesday, October 12, 2010

Engagement Invitation Matters

EFH, EFH Gerlafingen

Today was the big day of sincerity. The attic is now under the hood. Not necessarily married, but certainly well-guarded ...
Here are the photos from installing the wood structure: evidence


Wednesday, October 6, 2010

Guiltless Gourmet Chips Where Can I Find?

Neumann, Gerlafingen

A visit to the site that the masons are very fast. For today are almost all the walls upstairs.