Wednesday, December 29, 2010

Sleep Get A Symmetrical Face

beautiful land looking for?

In Luterbach on Heckenweg we can offer you a beautiful and central building site.
There are approximately 535m2 land available in a child-friendly cul de sac. Allocation and price is determined by agreement.
more information, visit: Homegate.ch
or 032 682 03 88 / info@beatus-co.ch





Monday, December 27, 2010

Waxed And Ripped Part Of Labia

EFH Weber, Gerlafingen

It can be erected

As is the EFH Weber, a ground floor house is now the architect's work is done. The is the sign for the roof, the roof raise.
See for yourself how it's going on:


Women Wearing Transparent Bra Only

Services (center)

plumbing center in the kitchen, bathroom and separate toilet (have here additionally opted for a shower).

ground level shower



Thursday, December 23, 2010

Descargar Diagrama Sony Kp-53v15

drying, dry and dry

For two weeks, we are minutes daily. 3x in the house and empty the water tank of the drying equipment. The electricity meter has now spent 1,800 kW, clearly the radiant heaters (2,000 KW) sucking power properly.

commissioning of the heat pump
Today is a day before Christmas, the heat pump into operation. To view this over Christmas New Year once and can be raised properly and then slowly back down. This allows the floor to expand and relax again. This has to happen so get started the tiling can and there are no stress cracks in the floor and tiles.

We are excited!

Sunday, December 19, 2010

Reylene Richards Wikipedia

Merry Christmas!

The Beatus + Co-Team wishes you a very Merry Christmas and a happy and prosperous 2011!

Here's a song for lovers ... :-)

Tuesday, December 7, 2010

Mens Waxing Uncensored

EFH Weber, Gerlafingen

second Stage already almost done!

to believe, was the first basement finished and now you can see by the first EC-walls have a domestic form. Despite the winter cold is working hard to complete the project on time.

Wednesday, December 1, 2010

Guys Motorcycle Birthday Cake

Deitingenstrasse EFH, EFH Luterbach

giant fridge, ceramic hob, oven and steamer at eye level ... All the modern things in a kitchen are combined with sleek design and smooth white.





Monday, November 29, 2010

Lic Market Plus -1 Policy

screed

The screed was introduced. Now our house is like a steam sauna, as high humidity.

Now it's airing, ventilation and airing ...

HvH offer the customer (extra charge) the possibility of quick drying with dehumidifiers and heaters. We asked in our circle of friends and organized two dehumidifiers and heaters. Thanks again!

After we pour the first three days after the floor could not enter the house and a further 5 days was not allowed to be aired today the water running in streams from the windows. All this without rupture.

Now we can back in, and - setting the BC - more than 3 times a day for five minutes air (per page). This brings nothing, but soothes the conscience ...

Now we can is using our drying equipment and heaters. After consultation with our BL we finally made it clear that we hammer out this year no house delivery anymore. If all goes well then need to dry 2 weeks. Only then can the tile purely

brief:.
We do have a ventilation system and a ventilation system also needs ventilation outlets. This has seen the floor layers probably different? He simply poured over the ventilation with screed. Super ... info to clarify who the BL and opens again?

was Here is a ventilation hole (duct).


Monday, November 22, 2010

Hardy Weinberg Population Genetics Lab

floor heating & air-water heat pump

Now it is warm?

The plumbing and heating installer takes over the plumbing (kitchen, bathroom, separate WC), underfloor heating, air water heat pump (special qualification required), solar and ventilation system. Because of the many trades that is a very important craftsmen. Here everything must go hand in hand in order to lose no time.

















floor heating, heating coils are well placed close (within 10-12 cm distance), ie, uniform heating.

 


















ventilation systems are in the bottom channels (flat) moved through the air and is removed. The scheme assumes a central ventilation system. The flowing of heated indoor air is conducted on a heat exchanger over. The heat exchanger sucks (as necessary) the still cool outside and the heated air to heat exchangers, the heat is now off to the outside air out and the only indoor air (in the summer, just the opposite, the outside air is cooled with cooling element). How it almost no energy laughed ears (Effekt. about 95%).






















Our heart: the air-water heat pump. If you use to heat your home ambient heat from the air and sun (solar), then this heat delivery charge and same inexhaustible.
about solar energy: 20%
heat pump about 55%
supply about 25% (electricity for pumps and from less -5 degrees Außentemeratur is switched on, a heat exchanger.)

More information about the German brands of our heat pump from Rotex:
http://de.rotex-heating.com/produkte/waermepumpe/waermepumpe-solar.html

information about the ventilation system at:
www.pluggit.com


















floor heating: distribution box in the upper floor






















toilet cistern by Grohe (there are only mounted brand products)

Friday, November 19, 2010

Denise Milani Spanish Look A Like

roof overhangs even emphasize

It should be mentioned that the roof overhangs at HvH only primed (white) attached. That is, the client must take himself again in one last coat of paint. We have had about 25 square meters, we have opted for high-quality exterior paint very well uncovered. The roof overhang on gable and eaves sides was lined with timber section. The profile of wood are screwed, which speaks for itself because it is so durable and holds. What speaks against it is that the screw heads are visible, what with nails or staples should not be the case. But with high-quality paint you can paint over the screw heads, abspachteln possibly with acrylic (paintable).

Wednesday, November 17, 2010

How To Use An Ez Roller Blunt

Now the house is close

Today was mounted outside the insulation and the primer for exterior plaster and Fasch. Now it is indeed difficult zutrocknen inside the house (interior plaster and cement), but can not schedule the time otherwise.

Tuesday, November 16, 2010

Can Herpes Only One Bump

Weber, Gerlafingen

The 1st Stage is done!

is hardly the groundbreaking ceremony over, is already the basement:

Example Welcome Text Message Blog

Future for Beatus + Co.! Neumann

Former Daughters this year was celebrated also with us. Under the new name, national Zunkunftstag, we launched this week, Aaron Schumacher of the various professional fields and facets of our operation closer.

Friday, November 5, 2010

Wrold Record Great White Okinawa

EFH, EFH Gerlafingen

Warm, warmer, heating ...

for a cozy warm at home this day, the heating engineer and moved the lines for the floor heating. In the photo you can see looks before had a beautiful floor is laid over it.

Monday, November 1, 2010

Whole Eye Fillet Roast

plastering

Today is the interior plaster.



















Tuesday, October 19, 2010

Where To Get Eye Brows Done In Calgary Threading

Addendum: shell

The support from the ground floor had noticed the masons, the bay, which will be glazed later, was too short. It had about 30 cm of the bottom plate was missing.
here, though the surveyor had forgotten the base plate when measuring something. The masons immediately have the missing piece bottom plate cased and suspended with steel and concrete (was provided) cast.

Here again, many thanks to the Mason team that we can only praise: Always helpful, very friendly and very well at work! Super!

Monday, October 18, 2010

Tory Burch Handbag In Malaysia

Weber, Neumann Gerlafingen

growth on Krokusweg!
Partly cloudy and gloomy it was only in the sky. At the symbolic groundbreaking ceremony for the new home of the Weber family dominated the minds of the sun. With a Cüppli and a few pretzel sticks met with the builder, architect, Hugo Schumacher, and the architect firm Bernasconi, at the start of the construction phase and the future new home.







White Discharge In Place Of Period, Not Pregnant

Addendum: Roof

Shortly after the topping was, I noticed that the rain pipe that was scheduled at the entrance to the left side, was suddenly placed on the RIGHT side. I was at the ceremony in the dark did not notice. Hmm, it was originally planned on the right. But since we had set the Regenwasserzysterne into the driveway and not, as the project planner (Heinz von Heiden) in the garden, was the house left corner of the shortest path. So Harry had changed from heathen to the start of construction plans and amended the drainpipe to the left corner of the house.
The amended drawings had the roofers not be met. After we confronted our construction manager and so he had viewed the site, We have now been confirmed in writing that the roofers install the drainpipe on the left side of the house is in order. The additional costs for min. 10 m rain line we had not taken over.

Thanks to Heinz von Heiden and our construction manager Mr. D.!


























When building from the roof has been probably one of the roofing of the two ventilation pipes. So it is now broken. This is not so bad, but just annoying. But here we Heinz has promised to Gentiles that the damage is repaired as quickly as possible.