screed

The screed was introduced. Now our house is like a steam sauna, as high humidity.

Now it's airing, ventilation and airing ...

HvH offer the customer (extra charge) the possibility of quick drying with dehumidifiers and heaters. We asked in our circle of friends and organized two dehumidifiers and heaters. Thanks again!

After we pour the first three days after the floor could not enter the house and a further 5 days was not allowed to be aired today the water running in streams from the windows. All this without rupture.

Now we can back in, and - setting the BC - more than 3 times a day for five minutes air (per page). This brings nothing, but soothes the conscience ...

Now we can is using our drying equipment and heaters. After consultation with our BL we finally made it clear that we hammer out this year no house delivery anymore. If all goes well then need to dry 2 weeks. Only then can the tile purely

brief:.
We do have a ventilation system and a ventilation system also needs ventilation outlets. This has seen the floor layers probably different? He simply poured over the ventilation with screed. Super ... info to clarify who the BL and opens again?

was Here is a ventilation hole (duct).


Monday, November 22, 2010

Hardy Weinberg Population Genetics Lab

floor heating & air-water heat pump

Now it is warm?

The plumbing and heating installer takes over the plumbing (kitchen, bathroom, separate WC), underfloor heating, air water heat pump (special qualification required), solar and ventilation system. Because of the many trades that is a very important craftsmen. Here everything must go hand in hand in order to lose no time.

















floor heating, heating coils are well placed close (within 10-12 cm distance), ie, uniform heating.

 


















ventilation systems are in the bottom channels (flat) moved through the air and is removed. The scheme assumes a central ventilation system. The flowing of heated indoor air is conducted on a heat exchanger over. The heat exchanger sucks (as necessary) the still cool outside and the heated air to heat exchangers, the heat is now off to the outside air out and the only indoor air (in the summer, just the opposite, the outside air is cooled with cooling element). How it almost no energy laughed ears (Effekt. about 95%).






















Our heart: the air-water heat pump. If you use to heat your home ambient heat from the air and sun (solar), then this heat delivery charge and same inexhaustible.
about solar energy: 20%
heat pump about 55%
supply about 25% (electricity for pumps and from less -5 degrees Außentemeratur is switched on, a heat exchanger.)

More information about the German brands of our heat pump from Rotex:
http://de.rotex-heating.com/produkte/waermepumpe/waermepumpe-solar.html

information about the ventilation system at:
www.pluggit.com


















floor heating: distribution box in the upper floor






















toilet cistern by Grohe (there are only mounted brand products)

Friday, November 19, 2010

Denise Milani Spanish Look A Like

roof overhangs even emphasize

It should be mentioned that the roof overhangs at HvH only primed (white) attached. That is, the client must take himself again in one last coat of paint. We have had about 25 square meters, we have opted for high-quality exterior paint very well uncovered. The roof overhang on gable and eaves sides was lined with timber section. The profile of wood are screwed, which speaks for itself because it is so durable and holds. What speaks against it is that the screw heads are visible, what with nails or staples should not be the case. But with high-quality paint you can paint over the screw heads, abspachteln possibly with acrylic (paintable).

Wednesday, November 17, 2010

How To Use An Ez Roller Blunt

Now the house is close

Today was mounted outside the insulation and the primer for exterior plaster and Fasch. Now it is indeed difficult zutrocknen inside the house (interior plaster and cement), but can not schedule the time otherwise.

Tuesday, November 16, 2010

Can Herpes Only One Bump

Weber, Gerlafingen

The 1st Stage is done!

is hardly the groundbreaking ceremony over, is already the basement:

Example Welcome Text Message Blog

Future for Beatus + Co.! Neumann

Former Daughters this year was celebrated also with us. Under the new name, national Zunkunftstag, we launched this week, Aaron Schumacher of the various professional fields and facets of our operation closer.

Friday, November 5, 2010

Wrold Record Great White Okinawa

EFH, EFH Gerlafingen

Warm, warmer, heating ...

for a cozy warm at home this day, the heating engineer and moved the lines for the floor heating. In the photo you can see looks before had a beautiful floor is laid over it.

Monday, November 1, 2010

Whole Eye Fillet Roast

plastering